Easton Airport Facilities

terminal interior at Easton Airport

Airport Terminal

The Easton Airport (ESN) terminal, located at 29137 Newnam Road, offers ample vehicle parking with both long-term and short-term options available. Inside the terminal, passengers can enjoy amenities, including free Wi-Fi, restrooms, and lounge seating. The terminal serves as the pick-up location for the Bay Runner Shuttle, offering connections to BWI Airport and Amtrak stations. Please note that advance ticket purchases are required for the shuttle service (learn more). 

Additional services found in the terminal:

Bay Runner Shuttle – Connecting Eastern and Western Maryland to BWI, Amtrack, Greyhound, smaller airports, and transit hubs.
Dr. Tom Rosenthal – Aviation Medical Examiner (AME) – call 410-860-8446 to schedule an appointment
Maryland Air – Fueling services, on-demand charter flights, and pilot lounge. Pilot shop open daily.
Sugar Buns Airport Café – Serving upscale classics and Eastern Shore specialties. Open to all for breakfast and lunch, 7 am to 3 pm daily.

EASTON AIRPORT OFFICE

The Easton Airport Office is located at 29051 Corkran Road.

Administrative staff are typically available Monday through Friday from 7 a.m. until 4 p.m. Appointments are preferred to ensure the best customer service experience.

The Airport Office phone number is 410-770-8055

A secure drop box is located in the entranceway for your convenience.

HANGARS AND TIE-DOWNS

TIE-DOWNS

$75 per month

T-HANGARS

T-hangar fees range from $280 to $507 per monthly, depending on location and hangar type. Easton Airport maintains a waiting list for T-hangar space. Contact airport management at 410-770-8055 if you would like to be added.

There is a $100 non-refundable fee to be placed on the list.

LARGE HANGARS

Lots are available for hangar construction. Contact airport management at 410-770-8055 for more details.

Airfield Modernization Program

In 2006, Easton Airport started an Environmental Assessment to plan for future safety improvements and to determine how the airport would conform to new FAA design standards. After an exhaustive 12-year assessment, Easton Airport’s plan was approved in 2018.

Easton Airport is now moving into the construction phase of the Airfield Modernization Program. We are excited to share details with the public throughout this process as the project moves forward.

Scroll to Top